Mock trading on Saturday, August 08, 2026
Official title
Mock trading on Saturday, August 08, 2026 - No new version release
Official record
Open source pageAI-prepared change brief
Check the official recordWhat changed
The National Stock Exchange of India Limited will conduct a mock trading session for the Electronic Gold Receipts (EGR) segment on Saturday, August 08, 2026. The session is divided into two parts: the first from the Primary Site starting at 10:45 hours, and the second from the Disaster Recovery (DR) Site starting at 14:15 hours. Members are advised that no new software version release is associated with this session. Trades executed during the mock session will not result in any financial obligations. Members must refer to the provided annexures for instructions regarding login parameters, market data broadcast, installation procedures for NEATPlus EGR Version 1.0.0, and DR site switchover guidelines. Connect2NSE and Extranet facilities will be unavailable during the DR site session.
- Who is affected
- All members of the Electronic Gold Receipts segment
- Required action
- Members must refer to the provided annexures for instructions regarding the mock trading session.
- Members must use the default password 'Neat@EG1' for the mock session.
- Key dates
- Mock trading session date — 07 Aug 2026
- Consequences
- Trades conducted during the mock session will not result in any fund pay-in or pay-out.
Source details
- Source
- National Stock Exchange of India
- Type
- circular
- Published by source
- 06 Aug 2026
- Document number
- NSE/EGR/75635
- Issuing division
- ELECTRONIC GOLD RECEIPTS
- Coverage area
- securities
Document text
National Stock Exchange of India Limited
Circular
| Department: ELECTRONIC GOLD RECEIPTS | |
|---|---|
| Download Ref No: NSE/EGR/75635 | Date: August 07, 2026 |
| Circular Ref. No: 23/2026 |
All Members,
Mock trading on Saturday, August 08, 2026 – No new version release
Exchange will be conducting a mock trading session in the Electronic Gold Receipts (EGR) segment on Saturday, August 08, 2026 as per following schedule:
| Mock Date: August 08, 2026 | |
|---|---|
| Particulars | Time in Hrs |
| Trading Session-1 from Primary Site | - |
| Pre-open session Open | 10:45 |
| Pre-open session Close* | 10:53 |
| Random closure in last one minute | |
| Normal Market open time | 11:00 |
| Block Deal Window Session open time | 11:45 |
| Block Deal Window Session-1 close time | 12:00 |
| Auction Market Open Time | 12:15 |
| Auction Market Close Time | 13:00 |
| Normal Market close time | 13:30 |
| Trading Session-2 from DR Site | - |
| Pre-open session Open | 14:15 |
| Pre-open session Close* | 14:23 |
| Random closure in last one minute | |
| Normal Market open time | 14:30 |
| Normal Market close time | 15:30 |
| Trade modification end time | 15:40 |
| Re-login Timings | - |
| Live Re-login start time | 16:30 |
| Live Re-login close time | 17:00 |
Members are required to take note of the below important points:
A) NEAT+ version details
| Version | Download Path on NSE Extranet: |
|---|---|
| 1.0.0 | /egftp/egcommon/NEATPlus100 |
Members are advised to refer to the following Annexures for important instructions regarding the mock trading:
Annexure 1: Important instructions regarding mock trading session. Annexure 2: Interactive Parameters for Login Annexure 3: Parameters for market data broadcast for EGR segment Annexure 4: Installation procedure for NEATPlus EG Version 1.0.0 Annexure 5: Important guidelines in case of switchover of trading system to Disaster Recovery (DR) Site
For and on behalf of National Stock Exchange of India Limited
Khushal Shah Associate Vice President
| Toll Free No | Email id |
|---|---|
| 1800-266-0050 (Option1) | msm@nse.co.in |
Annexure 1: Important instructions regarding mock trading session
| Particulars | Details |
|---|---|
| Password | Default password shall be “Neat@EG1” |
| No Financial Obligation: | Trades during mock sessions will not result in any fund pay-in or pay-out. |
| Live Updates: | Visit www.nseindia.com for any session-related updates. |
| Extranet / Member portal availability | Connect2NSE and Extranet facility shall not be available from 14:30 hours till end of mock session. Extranet API shall not be available from 14:30 to 15:30 hours. |
| Support: | For queries, call Toll-Free: 1800 266 0050 (Option 1). |
Annexure 2: Interactive Parameters for Login
Primary (BKC) / DR site
| Gateway Router IP Address | Port |
|---|---|
| 172.19.14.86 | 11887 |
Gateway IPs Subnet ranges –
| Network | 172.19.14.0 |
|---|---|
| Mask | 255.255.255.128 |
| Port | 11860 |
Annexure 3: Parameters for market data broadcast for EGR segment
Combined broadcast - Price volume (5 depth 1 second refresh), other related data, master updates, market open/close status message broadcast etc.
| Source 1 | Source 2 | |
|---|---|---|
| Stream | Multicast IP Address | Broadcast Port |
| EGR | 239.50.50.63 | 10863 |
Annexure 4: Installation procedure for NEATPlus EGR Version 1.0.0
The respective EXE and master files are available for download in the NSE EXTRANET path mentioned below:
| Exe/master files | Version / Setup Files | Path on Extranet |
|---|---|---|
| NEAT | NEAT EG Version 1.0.0 | /egftp/egcommon/NEATPlus100 |
| NEAT Adapter | NA_1.0.25_Setup.exe | /egftp /egcommon/NeatAdapter/ |
| Security & participant master file | security_eg.gz participant_eg.gz | egftp/egcommon/ntneat |
Pre-requisites:
- Application will support OS – Upto Windows 10
- Redistributable package should be downloaded from https://www.microsoft.com/en-us/download/details.aspx?id=48145 and installed on Desktop system before installing Neat EGR TWS exe
- For 32 bit system - vc_redist.x86.exe
- For 64 bit system - vc_redist.x64.exe
- Recommended resolution for NeatPlusEGR TWS is 1024 X 768
Installation:
- Download the setup file ‘NEATEGTWSSetup.exe’ to your hard disc in the root directory (i.e. C:\ or D:\ or E:).
- Go to the drive where NEATEGTWSSetup.exe is copied.
- Double click on the NEATEGTWSSetup.exe.
- The files will be extracted with the window pop up ‘NEATPlusEG Installer 1.0.0: Extracting Files’.
- It will be followed by ‘NEAT-EGR Version 1.0.0 Installer’ pop up window. Installation drive (where application will be installed) will be C: by default.
- The user can change the default installation drive to any other local drives (e.g. D: or E:)
- Click on ‘Install’ button on this pop-up window and follow the installation instructions.
- Message of successful installation will be displayed once the complete application is installed.
- The user can run NEAT-EG TWS application by double clicking on either of the following: a. NEAT-EG TWS shortcut icon created on the desktop. b. NEAT-EG TWS entry in the ‘Programs’ sub-menu of the ‘Start’ menu. c. NEAT-EG.exe located in the NEATEGDB-TWS directory in the installation drive.
Updating the new version with latest data:
- Download following files from NSE EXTRANET path egftp/egcommon/ntneat onto the logon drive:
- security_eg.gz
- participant_eg.gz
- Unzip the above files
- From the log on screen click on the “UPLOAD” button to update contracts and participants details.
Annexure – 5
Important guidelines in case of switchover of trading system to Disaster Recovery (DR) Site
- Kindly note below points after switch over to DR site: a. Trades of primary site will be available in Previous Trades window. b. Trades can be modified/cancelled using Multiple Trade Modification and Cancellation window respectively. c. Messages of primary site will be available in TWS Message Area.
- If user renames or deletes the User folder and re-login the NEAT terminal, then data of primary site shall not be available in the functional window as mentioned above point.
Research the source law
Find the provision behind this update.
No high-confidence provision match was found. Browse the law library, choose the affected provision and ask against the exact statutory text.
Browse source lawsRelated NSE updates
- Applicability of Additional Surveillance Measure (ASM)
- Applicability of Additional Surveillance Measure under IBC
- Applicability of Enhanced Surveillance Measure (ESM)
- Applicability of Short-Term Additional Surveillance Measure (ST-ASM)
- Graded Surveillance Measure (GSM) - Periodic relaxation of Surveillance action