NSE circular NSE/MSD/75498 · 31 Jul 2026
Official title
Colocation Update - Bulk upload facility for IP Message Rate Change requests.
Official record
Open source pageSummary
Check the official recordThe National Stock Exchange of India has introduced a bulk upload facility for submitting message rate change requests for colocation IP addresses. This facility allows members to process multiple requests simultaneously via the ENIT system, supplementing the existing individual submission process. Members must use the designated template available on the ENIT portal and ensure all data fields are accurate and free of duplicates. Files are limited to 100 IP records per upload, and the system will only process files that are entirely error-free. If a file is rejected, an error file will be generated for rectification. Existing processing fees, cutoff times, and operational terms remain unchanged.
What you must do
Circular
| Department: MEMBER SERVICE DEPARTMENT | |
|---|---|
| Download Ref No: NSE/MSD/75498 | Date: July 31, 2026 |
| Circular Ref. No: 54/2026 |
All Members,
Sub: Colocation Update - Bulk upload facility for IP Message Rate Change requests.
This is in continuation to Exchange consolidated circular NSE/MSD/73958 dated April 29, 2026, for matters related Colocation.
As part of our ongoing commitment to enhance member experience and operational efficiency, the Exchange regularly reviews and upgrades its services. Currently, members desirous of modifying the message category of their colocation IPs are required to submit requests individually for each IP address via the ENIT system. This process, while accurate, can be time-intensive—particularly for members managing multiple IPs.
In continuation of our efforts to streamline operations, we are pleased to introduce a Bulk Upload Facility for submitting Message Rate Change requests (upgrade/ downgrade) for Colocation IPs, in addition to the existing individual submission option.
Members are requested to note the following key points in this regard:
Page 1 of 2
This circular shall be effective from start of business hours of August 03, 2026.
All other existing terms and conditions as specified in the colocation consolidated circular reference no. NSE/MSD/73958 dated April 29, 2026, remain unchanged.
For and on behalf of National Stock Exchange of India Limited
Bharat Gandhi Associate Vice President
| Toll Free No | Email id |
|---|---|
| 1800-266-0050 | msm@nse.co.in |
Disclaimer for Colocation Facility: Participants desirous of availing Co-location facility or who have already subscribed to Exchange’s Colocation facility shall have to strictly abide by the Co-location access policy, Guidelines (updated from time to time) and Circulars, at all times. Additionally, all communications/ instructions/ circulars/ directions from the Exchange have to be complied with in this regard. Any non-compliance shall invite disciplinary action by the Exchange which will be in accordance with Exchange Byelaws, Rules and Regulations. Participants are requested to note that Exchange will provide co-location facility on a best effort basis and shall not be responsible for any direct/indirect/consequential loss/damage/claim of any kind for any reason whatsoever including but not limited to power failure, air conditioning failure, system failure and loss of connectivity etc. Further, the Exchange shall not be liable for discontinuation of co-location facility owing to legal and/or regulatory requirement. Colo participants are requested to note that the Exchange Co-location facility does not have a separate BCP / DR site and Co-location is not available in the Exchange’s DR facility. Considering the current technology intensive environment in which Indian Securities market operates, to ensure stability in operations of Colo participants and to protect the interest of investors and market at large, colo participants are advised to sufficiently review all potential risks along with its impact on the business and put in place Business Continuity Planning (BCP)/Disaster Recovery (DR) systems.
Page 2 of 2
Key dates
Who is affected
Thresholds
Exceptions
If you do not comply